361 |
A/R & M/O to Gents Hostel(SH: Internal Finishing of Gymnasium hall) at AIIMS(Agt. No 17/B&R/CD II/2014-15 |
- |
- |
362 |
S/R to 50 Nos. flats at AGV complex.(SH: Renovation of flat No. SIII/425 in AGV Complex) at AIIMS(Agt. No18/B&R/CD-II/2014-15 |
- |
- |
363 |
S/L/F of 100 Pair and 20 Pair Telephone Cable for CI and CII flats at AIIMS, New Delhi(Agt. No. 427/Engg/Ac&R/14-15 |
- |
- |
364 |
P/I of Air Washer in Ward A & B NDDTC, Ghaziabad, AIIMS(Agt. No. 428/Engg/AC&R/14-15) |
- |
- |
365 |
Special repair of L.T. Panel/D.G. panel installed at Sub-station of Trauma Centre(SH: Supply and retrofit of 1600amps and 3200amps air circuit breaker Phase III(Agt.No. 51/E2014-15) |
- |
- |
366 |
M/O Boiler Sets Installed at Trauma Centre of AIIMS(SH: Comp. Maint. of 2 Nos oil/CNG boilers for 12 Months)(Agt.No. 52/E2014-15 |
- |
- |
367 |
All in Comprehensive Operation and Maintenance of Air Conditioning Plant at Dr. R.P. Centre,AIIMS, New Delhi.(Agt. No> 426/Engg/AC&R/14-15) |
- |
- |
368 |
M/O E.I &fans at Trauma Centre of AIIMS (SH: amc of 8 KVA/40KVA APC main UPS)(Agt. No. 50/E/2014-15) |
- |
- |
369 |
A/R & M/O to Dr. R.P. Centre (SM: Finishing work in OT and other places in Dr. R.P. Centre) at AIIMS (Agt.No 16/B&R/CD-II/2014-15) |
- |
- |
370 |
Addition and alteration in CTVS OT area at Ist floor of C.N. Centre at AIIMS (Agt.No. 10/B&R/CD-1/2014-15) |
- |
- |